INTERNATIONAL TRADING · PRECIOUS METALS · ENERGY · COMMODITIESglobal@aurestique.com
AURESTIQUE / INTERNATIONAL TRADING

Electrolytic Copper Cathodes

Rectangular electrolytic copper plates for industrial processing and alloy production.

Electrolytic Copper Cathodes

Product specifications

Reference specifications — final lot subject to confirmation
ParameterSource value / description
Product gradeGrade A; purity subject to the agreed specification
Copper — source references99.96% minimum on offer; 99.97% in technical text
Total impurities — technical sheet≤65 ppm (typical ≤25 ppm)
Electrical conductivity≥100% IACS
Se / Te / Sb / Pb / Sn — specified<1 ppm each
Bi / As — specified<0.5 / <3 ppm
Fe / Ni / S / Ag — specified<5 / <5 / <10 / <12 ppm
Oxygen — specified100–600 ppm
Technical sheet dimensions990 ±10 × 970 ±10 mm; 5–25 mm
Package — technical sheet2,300–3,000 kg
Specification contextPurity, total impurity limits, dimensions and package weights differ between the offer and technical pages. They are separate source references, not a single reconciled specification. Obtain the lot COA and agree all limits in the SPA. The offer also lists approximately 914 × 914 × 12 mm and inconsistent pallet weights, which are not used as delivery commitments.

Source reference: ELECTROLYTIC_COPPER_CATHODES_CLEANED_FINAL (1).pdf · pp. 1–4

Applications

Raw material for copper bars and alloy production, as described in the technical sheet.

Inspection & delivery

The source refers to SGS or equivalent quality and quantity inspection. Inspection scope, location, cost allocation and document acceptance must be agreed for the transaction. This is not a claim of company certification.

CIF supply is described in the source procedures. Confirm the named port, origin, quantity, shipment schedule, insurance, packaging and exact Incoterms edition in the SPA. No source quantity is represented as current inventory.

Commercial procedure

Inquiry and LOI → ICPO / FCO → SPA and KYC → agreed banking instrument → product and document verification → inspection and shipping → settlement. SBLC MT760, DLC MT700 and MT103 are referenced in source procedures; the final instrument and payment trigger require agreement between the parties and their banks.

View the trade procedure guide
Subject to availability, supplier confirmation, due diligence, contractual agreement and current market conditions.
LET’S DISCUSS YOUR REQUIREMENTS

Your next trade starts with a conversation.

Start a business inquiry ↗